+33 4 81 68 04 04

APPLICATION STUDY

Your part. Your process. Our study.

Describe your application and provide any documents useful to our technical team. The information you have is sufficient to start the conversation; the rest can be determined together.

  1. Contact details
  2. Production
  3. Process
  4. Documents & timeline

Who is managing the project?

Provide the contact to be reached and your project reference.

Required fields. Other information can be clarified during the discussion.

Define the part and the area concerned

In the part description, identify the reference concerned and the version of the drawing being used. Locate the area to be treated on an annotated view, showing its orientation and the units. If several faces or references are involved, distinguish the requirements rather than grouping them together in a general description.

Specify whether the part presented corresponds to its condition before the proposed operation. What differences exist between this part and the other production variants? Report information that is still uncertain, particularly concerning the grade or coating. The applications presented on the website can help you describe your requirements, without prejudging their feasibility.

Turn the expected result into acceptance criteria

In the field devoted to the operation, separate the intended function from appearance preferences. Avoid an objective such as “clean result” without specifying what will be observed. Indicate the requirements already established in your documentation and those that remain to be discussed. A reference image must be accompanied by an explanation of what it illustrates.

To prepare for validation, formulate the following questions and identify the person authorised to accept the result:

  • In which area and under what conditions will the result need to be checked?
  • Which criteria are essential and what variations would be acceptable?
  • Which inspection method do you use, and which thresholds remain to be defined?
  • Which areas must remain unchanged, within boundaries to be agreed during the study?

Prepare questions about trials and integration

If trials are being considered, indicate which part references could be available and which differences should be examined. The choice of parts, their number and the trial conditions need to be agreed with NWS Laser. Do not present a single part as representative of every situation without explaining that choice.

In the integration constraints, describe how the part arrives at the station and how it is positioned. Does the stated cycle time cover only the laser operation or a wider sequence? Which interfaces and precautions remain to be specified? Technical expertise provides a starting point for these questions; the machine catalogue does not replace the definition of the requirements.

Select the files and organise the decisions

Choose documents that directly explain the area and the objective: give preference to an identified version rather than several contradictory drawings. Name the files with the part reference and their revision identifier. Specify in the form which document is authoritative and which annotations merely describe an assumption.

Before submitting, check the displayed permitted formats, number of files and file size. In the schedule, distinguish your desired milestones from decisions that remain open: criteria to be validated, availability of parts or choice of inspection method. Indicate who will need to take part in each decision, without turning these wishes into commitments to carry out the work.